Brilliant Dam (2010)

Work has begun at Brilliant Dam, just outside of Castlegar, BC. A brief synopsis for this project is to remove deteriorated concrete and replace with new concrete on the spillway and spray wall. A wooden engineered stair tower has been designed and constructed to allow access to the areas for rehabilitation. Engineered platforms will be tied in to the stair tower in eight foot lifts. Special...
read more

Upper Bonnington

Job Description : The concrete refurbishment of the old tailrace. This work is a prelude to the up grade of the installation at a future date. Our office in Castlegar is performing this...
read more