Brilliant Dam (2010)
Work has begun at Brilliant Dam, just outside of Castlegar, BC. A brief synopsis for this project is to remove deteriorated concrete and replace with new concrete on the spillway and spray wall.
Upper Bonnington
Job Description : The concrete refurbishment of the old tailrace. This work is a prelude to the up grade of the installation at a future date. Our office in Castlegar is performing this work.
